Posts from January 2020

1 Item

Create 800 Update

by Terrie Smith

The BUILDING: The most noticeable change since the last bulletin is the floor surface tiles having been delivered are laid and the majority of the re-plastering has been completed. It was when a portion of loose plaster was removed from the south wall by the altar that there was evidence of a previous window, which […]